Work on roof restarts

After many months waiting for a good spell of weather for the roof, Thomas and Matt have restarted on the roof. The new roof is a EPDM membrane which is a type of rubber sheet about 2mm thick.

The roof was re-started last Thursday and should be finished on Monday and I have to say I am really sad and disappointed with the results:

  • It all seems a bit of a patch work and looks ugly
  • There are quite a few large bubbles
  • There are squishy bits that move down under pressure of a foot
  • The rubber membrane doesn’t wrap over the edge of the roof, which makes sense to protect the substrate from the weather etc. See diagram below
  • There about 12 different seams in our EPDM roof, I would have thought you could have got away with four seams joining four pieces of membrane together. PS. most EPDM roof failures are around the seams so it’s a good idea to minimise them
  • When it rains there are still standing pools of water

This roof looks DIY to me and from the onset I was hoping they would get the levels of the roof right so water would drain correctly, but no, they just built on the existing roof contours. I am really not happy with this and can see this roof being redone (when we can afford it) in a few years down the road. We had plans for a deck but it’s no point in putting that down if the roof has to get ripped up. Sigh.

By the way there is still a complete roll of EPDM plus, so running out of the membrane shouldn’t have been a factor for the existing EPDM patchwork. Aimee’s face sums it up.

What probably makes me most sad is that Aimee and I are trying are hardest to lovingly restore the house and then we get this sort of work. It makes me think what’s the point of all our effort.