I’m gathering all time-lapse films here.
Constructing first porch column. 20th December, 2023
Porch removal. 13th November, 2023
Parging front doorway. 23rd September, 2023
Shifting dirt. 18th September, 2023
Floor painting. 13th October, 2023
Extending wall. 29th August, 2023
Bedroom epoxy floor coat. 7th August, 2023
Mistakes were made. 4th July, 2023
Rebuilding wall. 11th April, 2023
A Mild Case of Demo. 4th April, 2023
Recap of 2022
Filling in trench. 27th November, 2022
Filling in trench. 21st November, 2022
Clean up after parging. 15th November, 2022
Last of the parging. 15th November, 2022
Last of the parging. 8th November, 2022
Parging inside. 2nd November, 2022
Gravel day. 18th October, 2022
Dimple board. 17th October, 2022
Filling trench. 4th October, 2022
Plastering rear wall. 30th July, 2022
Fixing footings. 27th July, 2022
Fixing door openings. 8th July, 2022
Enlarging bathroom window. 29th June, 2022
Finished leveling floor. 1st June, 2022
More back trench digging. 21st May, 2022
Self-leveling. 19th May, 2022
Harling. 5th May, 2022
Fixing concrete floor. 25th April, 2022
Clearing back trench. 1st April, 2022
Partition wall. 25th January, 2022
The Pour. 15th November, 2021
Stego vapour barrier and insulation. 8th – 22nd August, 2021
Cutting back the footings. 14th August, 2021
Compaction, compaction, compaction. 18th July, 2021
Shifting and leveling gravel. 25th July, 2021
Off with the bannister. 18th April, 2021
Basement dig. 15th April, 2021
Planting “Big Nan”. 11th April, 2021
Making new door, pretty boring. August – November, 2020
Olympic snow plowing. 19th December, 2020
Footing fixes before the inevitable touch of frost. December 5th, 2020
Frost lines. December 5th, 2020
A stroll through Disaster Mansion. November 28th, 2020
Finally finished with the support posts. December 27th, 2020
Olympic leaf raking. November 21st, 2020
Rebar and block fill. November 15th, 2020
Lest we forget. November 11th, 2020
Small partition wall. November 14th, 2020
Fixing a hole. November 12th, 2020
Filling in trenches. November 12th, 2020
Door hinges. October 23rd, 2020
Replacing third pillar support. October 22nd, 2020
Replacing second pillar support. October 22nd, 2020
Electrical mains trench. September 30th, 2020
Plumbing rough in. September 9th, 2020
Mail box madness. July 14th, 2020
Painting back door. June 27th
Reinforcing footings. May 30th – 31st
Reinforcing footings. May 23rd
Finished side lawn. March 21st – 7th April
Non essential garden work goes ahead amidst warnings – 21st – 22nd March
Digging up old waste water pipe. 14th – 15th March
Parge removal. 29th February
Tree pruning on the shortest day of the year
Grading the earth in preparation for a concrete pour. 14-15th December, 2019
An oldie, side garden. 24th August – 16th September, 2018
Another oldie, side garden. 17th September – 26th November, 2018
House wrap. 23rd November, 2019
Chimney removal. 14th – 19th October, 2019
French drain clearance. 5th – 6th October, 2019
Lawn preparation. 23rd June, 2019
Lawn preparation. 8th – 9th June, 2019
Lawn preparation. 1st – 2nd June, 2019
Lawn preparation. 25th – 27th May, 2019
26th April, 2019
April 20th, 2019
6th January, 2019
11th December, 2018
10th December, 2018
17th – 25th November, 2018
Removal of the old roof. October, 2018
16th – 20th June, 2018
17th May, 2018
11th – 16th May, 2018