Constructing first porch column. 20th December, 2023

Porch removal. 13th November, 2023

Parging front doorway. 23rd September, 2023

Shifting dirt. 18th September, 2023

Floor painting. 13th October, 2023

Extending wall. 29th August, 2023

Bedroom epoxy floor coat. 7th August, 2023

Mistakes were made. 4th July, 2023

Rebuilding wall. 11th April, 2023

A Mild Case of Demo. 4th April, 2023

Recap of 2022

Filling in trench. 27th November, 2022

Filling in trench. 21st November, 2022

Clean up after parging. 15th November, 2022

Last of the parging. 15th November, 2022

Last of the parging. 8th November, 2022

Parging inside. 2nd November, 2022

Gravel day. 18th October, 2022

Dimple board. 17th October, 2022

Filling trench. 4th October, 2022

Plastering rear wall. 30th July, 2022

Fixing footings. 27th July, 2022

Fixing door openings. 8th July, 2022


Enlarging bathroom window. 29th June, 2022

Finished leveling floor. 1st June, 2022


More back trench digging. 21st May, 2022

Self-leveling. 19th May, 2022


Harling. 5th May, 2022

Fixing concrete floor. 25th April, 2022

Clearing back trench. 1st April, 2022

Partition wall. 25th January, 2022

The Pour. 15th November, 2021

Stego vapour barrier and insulation. 8th – 22nd August, 2021

Cutting back the footings. 14th August, 2021

Compaction, compaction, compaction. 18th July, 2021

Shifting and leveling gravel. 25th July, 2021


Off with the bannister. 18th April, 2021

Basement dig. 15th April, 2021

Planting “Big Nan”. 11th April, 2021

Making new door, pretty boring. August – November, 2020

Olympic snow plowing. 19th December, 2020

Footing fixes before the inevitable touch of frost. December 5th, 2020

Frost lines. December 5th, 2020

A stroll through Disaster Mansion. November 28th, 2020

Finally finished with the support posts. December 27th, 2020

Olympic leaf raking. November 21st, 2020

Rebar and block fill. November 15th, 2020

Lest we forget. November 11th, 2020

Small partition wall. November 14th, 2020

Fixing a hole. November 12th, 2020

Filling in trenches. November 12th, 2020

Door hinges. October 23rd, 2020

Replacing third pillar support. October 22nd, 2020

Replacing second pillar support. October 22nd, 2020

Electrical mains trench. September 30th, 2020

Plumbing rough in. September 9th, 2020

Mail box madness. July 14th, 2020

Painting back door. June 27th

Reinforcing footings. May 30th – 31st

Reinforcing footings. May 23rd

Finished side lawn. March 21st – 7th April

Non essential garden work goes ahead amidst warnings – 21st – 22nd March

Digging up old waste water pipe. 14th – 15th March

Parge removal. 29th February

Tree pruning on the shortest day of the year

Grading the earth in preparation for a concrete pour. 14-15th December, 2019

An oldie, side garden. 24th August – 16th September, 2018

Another oldie, side garden. 17th September – 26th November, 2018

House wrap. 23rd November, 2019

Chimney removal. 14th – 19th October, 2019

French drain clearance. 5th – 6th October, 2019

Lawn preparation. 23rd June, 2019

Lawn preparation. 8th – 9th June, 2019

Lawn preparation. 1st – 2nd June, 2019

Lawn preparation. 25th – 27th May, 2019

26th April, 2019

April 20th, 2019

6th January, 2019

11th December, 2018

10th December, 2018

17th – 25th November, 2018

Removal of the old roof. October, 2018

16th – 20th June, 2018

17th May, 2018

11th – 16th May, 2018


Skip for Joy. 2nd May, 2018

The Old Club House. 22nd April, 2018

Poison Ivy Clean up. 21st April, 2018

Clearing out the garden. February – March, 2018